10
2025
-
02
Notice | Guiping has 4 new ships about to be launched, traffic control, please pay attention to avoid.
Author:
Guiping Hongxin Shipbuilding Co., Ltd. has recently launched new ships. To ensure the smooth operation of the ship launching and the safety of passing vessels, the following matters are hereby announced: 1. The operational water area is the water area of Guiping Hongxin Shipbuilding Co., Ltd. in the Liulan factory area (Xiawan Village, Mengxu Town, Guiping City, Guangxi).
Announcement from the Guigang Maritime Bureau regarding the launching operations of new vessels by Guiping Hongxin Shipbuilding Co., Ltd.
No. [2025] 0096
Guiping Hongxin Shipbuilding Co., Ltd. has recently had new vessels launching operations. To ensure the smooth progress of the launching operations and the navigation safety of passing vessels, the following matters are announced:
1. Operation water area: The water area of Guiping Hongxin Shipbuilding Co., Ltd. in the Liulan factory area, Guiping City, Guangxi (Xiawan Village, Mengxui Town, Guiping City, Guangxi).
2. Vessel overview and operation time (1) Binhang 0866, vessel identification number: CN20246049540, vessel type: bulk carrier, total length: 77.83 meters, beam: 15.4 meters, depth: 5.25 meters. Launching time: February 10, 2025, 13:00-17:00. (2) New vessel 1, vessel identification number: CN20240510609, vessel type: bulk carrier, total length: 77.83 meters, beam: 15.4 meters, depth: 5.25 meters. Launching time: February 11, 2025, 14:00-18:00. (3) New vessel 2, vessel identification number: CN20242503817, vessel type: bulk carrier, total length: 77.84 meters, beam: 15.4 meters, depth: 5.25 meters. Launching time: February 12, 2025, 14:00-18:00. (4) Fuhang 9689, vessel identification number: CN20240180472, vessel type: bulk carrier, total length: 77.83 meters, beam: 15.4 meters, depth: 5.25 meters. Launching time: February 13, 2025, 14:00-18:00.
3. Guard vessel: Guiping Passenger Ferry 108.
4. Precautions (1) During the operation, other vessels must not enter the operation water area without permission. (2) The maneuverability of the launching vessels is severely limited, and passing vessels should enhance lookout, closely monitor the dynamics of the new vessels, and obey on-site commands. (3) The guard vessel must display signals as required and maintain smooth communication. (4) Traffic control measures will be implemented during the launching of the new vessels, and passing vessels should actively avoid and maintain a safe distance for safety.
Guigang Maritime Bureau
February 9, 2025